TASER® X3™ ECD Quick Start Guide
Step 7: Congure the FlashlightThe X3 ECD’s LED ashlight can be turned on or o, or set to adjust its intensity depending on the ambient light (auto
Step 8: Congure the Top/Bottom Lasers To set up this feature, follow these steps: 1 Press and hold the selector switch () until the MAIN MENU dis
Step 9: Remove Smart Cartridge Shipping CoverSmart Cartridges (sold separately) are shipped with a shipping cover in place. Remove these covers befo
Step 10: Load the Smart CartridgesBefore installing and using a Smart Cartridge, inspect the blast doors for cracks. The inspection shou
To load the Smart Cartridges, follow these steps: 1 Make sure the protective shipping cover is removed from the Smart Cartridge. 2 Keeping your
Step 11: Trigger SwitchUnlike a rearm trigger, the X3 trigger switch is a momentary electrical switch. The trigger is operational only when the
Step 12: ARC SwitchPressing the ambidextrous Arc display/Re-energize/Cartridge advance (ARC) switch supplies additional energy to the target. The A
Step 13: Spark TestThe spark test should be performed with cartridges loaded in the ECD. Use inert cartridges for spark tests if they are available.
Quick Reference: Display IconsThe central information display (CID) provides information about the ECD’s battery charge status, cartridge bay stat
!Cartridge Bay ErrorCartridge EnergizedCartridge SelectedCartridge Bay LockedGood Circuit CompletionPartial/ Intermittent Circuit CompletionNo Circuit
Congratulations on purchasing your X3 ECD.Read this section to start using your X3 ECD quickly.Your TASER X3 Electronic Control Device (ECD) includes
CAM-Lock, EPM, Smart Cartridge, Warning Arc, Magnesium Transporter, X3 and ø are trademarks of TASER International, Inc., and TASER® is a registered t
Quick ReferenceGet to Know the X3 ECDSmart Cartridge(Sold Separately)Bottom LaserBlast DoorSelector SwitchTrigger SwitchIndex Finger RestCAM-Lock Safe
Step 1: Remove the EPM Protective Label 1 Remove the protective label from the Enhanced Power Magazine (EPM) contacts before installing t
Step 2: Place the CAM-Lock™ Safety in the SAFE PostionThe ambidextrous safety can be operated from either side. Simply shift the safety to the do
Step 3: Remove the Inert CartridgesUse the left hand to unload cartridges beginning with the rightmost bay. By unloading from right to left (or left
Step 4: Install the EPMInstall the new EPM battery and insure that the EPM is fully inserted into the X3 ECD. Apply sucient force to ensure the EPM
Step 5: Congure the Deployment ModeThe X3 ECD can be congured for two dierent deployment modes, Semi-Automatic and Manual. To select the dep
Step 6: Congure the LanguageBe careful in selecting the language. If the CID suddenly becomes unrecognizable, the wrong language may h
Comments to this Manuals